Oliveira, J. A. de, Kodama, T. K., Paredes, F. J. G., & Godinho Filho, M. (2019). APLICAÇÃO DO QUICK RESPONSE MANUFACTURING (QRM) PARA A REDUÇÃO DO TEMPO DE MANUTENÇÕES PROGRAMADAS EM UMA SUBESTAÇÃO TRANSMISSORA DE ENERGIA ELÉTRICA. South American Development Society Journal, 5(14), 96. https://doi.org/10.24325/issn.2446-5763.v5i14p96-111